Energy Saving Features
Trane Furnace and Air Conditioner
Energy Star Vinyl Windows
Energy Efficient R-30 Attic Insulation
Energy Conserving Insulation
Tyvek House Wrap
Tuff-N-Dri Foundation Waterproofing with 30yr Warranty
Construction Features
Custom Architectural Plans
8” Poured Reinforced
Concrete Basement Walls
Individually Engineered Foundation
Quality Framed Construction
Flowguard Water Lines
220V Dryer Outlet & Dryer Vent
Pre-Wired Telephone & Cable TV
Category 5 Computer Networking
Finished Security System
Rough-In Central Vac
200 Amp Electric Services
Steel I-Beam with Steel Columns
Return Air Vents in all Bedrooms
3/4” Tongue and Groove Subfloor
Floors, Nailed, Screwed and Glued
Interior Walls Screwed to prevent Squeaking |  | Exterior Features
Coach Light, per plan/elevation
30yr Dimensional Shingles
3 Weather Resistant Electrical Outlets
Poured Concrete Driveways and Walks
Comprehensive Landscaping and
Fully Sodded Lot
Electric Garage Door with 2 Remote Openers
Natural Material with 6 1/2” Beaded
Vinyl Siding
Window Grids on Front Elevation
Raised Panel Insulated Garage Doors
Four Frost Free Hose Bibs
Interior Features
9’ Ceiling on the First Floor
Electric Door Chimes
Protective Smoke Detectors
5 ¼” Base and 3” Casing Entire House
Hardwood Flooring in Foyer, Hall,
Kitchen, Lav. and Dinette
Gas Fireplace
Stain Resistant Carpeting and Padding
Two-Panel Solid Core Masonite Interior Doors
Ceiling Fan Pre-wired in Dinette, Den and
Master Bedroom
Ceramic Tile Flooring in Laundry
Clear Glass Shower Doors
Egress Basement Windows
Knockdown Textured Ceilings
Stained Handrail and Iron Ballusters
Satin Nickel Door Hardware |  | Kitchen Features
Custom Maple Cabinets
Gourmet-Inspired Workspace
Built-In Pantry
Plumbing for Automatic Icemaker
Sterling Stainless Steel Double Sink
Kohler Faucet with Sprayer
Granite Countertops
Whirlpool Appliances
Bath Features
Full Mirrored Vanities
Maple Cabinets
Water Saver Shower
Kohler Tub in Master Bath
Cultured Marble Tops
Kohler Faucets
Ceramic Tile Floor in all Baths
Inspections
Pre-Construction Conference
Pre-Drywall Inspection
Pre-Closing Inspection
Homeowner Manual
90 - Day Post Close Inspection
11 - Month Post Close Inspection |